New Delhi | Mumbai | Hyderabad | Chandigarh | Lucknow +91-11-4171-5540 contact@sarthaklaw.com

Energy open access gets the green light

To further speed up India’s mission of achieving half its installed power capacity through non-fossil fuels by 2030, the Ministry of Power (MoP) by its notification of 6 June 2022, introduced the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2021 (rules)…

To further speed up India’s mission of achieving half its installed power capacity through non-fossil fuels by 2030, the Ministry of Power (MoP) by its notification of 6 June 2022, introduced the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2021 (rules)…